Home
Plans
Framing
Cupola
Siding
Roof
Paint
Windows
Stairs
Heating
Plumbing
Electric
Air Cond.
Floors
Tile
Ceiling
Lighting
Finished Project

Barn-Hayloft / Studio Conversion

Plumbing
In order to minimize costs, plumbing was designed to be only on the east side of the building. Also a grinder/pump was installed to connect the waste system in the barn to the waste system in the main house.Copper pipe was used for all supply and PVC was used for waste. Since the hot water will only be used occassionally, we opted for an AquaStar on demand water heater.
Click on any image to enlarge
Shower Plumbing
Grinder & Pump
On Demand Water Heater